Abstract
Ambitious goals for the upgrade of construction aimed at energy conservation may quite often bounce due to different barriers, from design and detailing, through construction, to commissioning and behavioural ones. To overcome these, this paper focuses on the missing link of the construction process - the Informative Commissioning, the pre and post occupancy monitoring, and the POE, all integral parts of the ZeroPlus EU project. Limitations, barriers and other considerations and complexities encountered through the project's stages will be presented, alongside the formation of the methodology and some preliminary results of the first case studies to be commissioned.
| Original language | American English |
|---|---|
| Article number | 012038 |
| Journal | IOP Conference Series: Earth and Environmental Science |
| Volume | 410 |
| Issue number | 1 |
| DOIs | |
| State | Published - 24 Jan 2020 |
| Event | Sustainability in the Built Environment for Climate Change Mitigation, SBE 2019 - Thessaloniki, Greece Duration: 23 Oct 2019 → 25 Oct 2019 |
All Science Journal Classification (ASJC) codes
- General Environmental Science
- General Earth and Planetary Sciences
Fingerprint
Dive into the research topics of 'Towards Zero Energy Settlements - A brief note on commissioning and POE within the EU ZeroPlus Settlements'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver