Minimizing total load on parallel machines with linear deterioration

Research output: Contribution to journalArticlepeer-review

Abstract

We study a scheduling problem with linear deterioration of job processing times. We consider parallel identical machines. The objective is minimum total load, i.e., minimum total processing times on all the machines. We propose a simple heuristic of a greedy type for this NP-hard problem. A lower bound based on the geometric mean of the job deterioration factors is also introduced. The greedy heuristic is shown to guarantee an optimal solution for small size problems, and our numerical tests indicate that in general it produces very close-to-optimal schedules.

Original languageEnglish
Pages (from-to)771-779
Number of pages9
JournalOptimization Letters
Volume14
Issue number3
DOIs
StatePublished - 1 Apr 2020

Keywords

  • Greedy heuristic
  • Linear deterioration
  • Parallel machines
  • Scheduling
  • Total load

All Science Journal Classification (ASJC) codes

  • Control and Optimization

Fingerprint

Dive into the research topics of 'Minimizing total load on parallel machines with linear deterioration'. Together they form a unique fingerprint.

Cite this