Abstract
Mosheiov [4] and Fiszman and Mosheiov [2] studied flowshop scheduling problems with position dependent job processing times and proposed algorithms which employ solving an assignment problem as a subroutine. This subroutine needs a correction. We describe such a correction. The running times of the corrected algorithms match the best known running times for the studied problems.
Original language | English |
---|---|
Pages (from-to) | 1-2 |
Number of pages | 2 |
Journal | Information Processing Letters |
Volume | 147 |
DOIs |
|
State | Published - Jul 2019 |
Keywords
- Bi-criteria assignment problem
- Flowshop
- Position-dependent processing times
- Scheduling
All Science Journal Classification (ASJC) codes
- Theoretical Computer Science
- Signal Processing
- Information Systems
- Computer Science Applications